VIA Rail Canada wishes to provide advanced notice to residents living near its rail infrastructure of upcoming track infrastructure upgrades along the railway corridor in your community.
WHY: For operational purposes.
WHAT: Replacement and elimination of turnouts within the railway right-of-way.
- One (1) turnout replacement near Principale Street (Casselman)
Work is planned to take place over the course of two to three nights in each location. For operational reasons, it will occur while trains are not operating on the tracks (between 8:00 PM and 10:00 AM). These track infrastructure upgrades might cause some noise and VIA Rail will aim to limit inconveniences resulting from this work.
WHEN: Wednesday, October 6 to Sunday, October 10, 2021, inclusively. The preliminary schedule is subject to revision or adjustment as necessary.
WHERE: The work will take place within the railway corridor on the Alexandria subdivision at pinned locations (see map).
For more information about this work, please contact us at 1 888 VIA-RAIL (1 888 842-7245) or by email at customer_relations@viarail.ca.